Send Message
Shenzhen Best Automation Equipment Co., Ltd.

One Station 18650 / 21700 / 32650 Cylindrical Battery Production Line

Product Details:
Place of Origin: China
Brand Name: BT
Certification: ISO9001
Model Number: BT-2113B
Payment & Shipping Terms:
Minimum Order Quantity: 1set
Price: 400000USD/pcs
Packaging Details: Wooden box
Delivery Time: 2 months
Payment Terms: T/T
Supply Ability: 1 set/Two months
  • Detail Information
  • Product Description

Detail Information

POWER: AC380V 50/60HZ 16KW Air Pressure: 0.4-0.8Mpa
Suitable For Highland Barley Paper: 100mm-350mm Standard Test Instrument: HK3562
Test Method: 4-wires System Suitable For Cells: 18650 And 32700
Weight: 3500KG
Highlight:

32650 Cylindrical Battery Production Line

,

21700 Cylindrical Battery Production Line

,

One Station 18650 Battery Assembly Line

Product Description

18650/21700/32650 cylindrical battery one station production line with high technic and two years warranty

 

 

Equipment name: Automatic production line of power energy storage battery pack

 

Introduction to equipment combination

One Station 18650 / 21700 / 32650 Cylindrical Battery Production Line 0

Unit 1

◎ Electric core part) : 18650 automatic box electric core (10*10) automatic feeding, one-time 6

Box (600PCS18650 cell)

◎ Automatic finishing pad


◎ Automatic code scanning → automatic sorting part (10 OK files, one NG file, 2 /3 /4 /5 can be set as the same file, increase the number of cell storage, each slot is 100PCS, two slots are in the same file, then 200PCS, 3 slots are in the same file, then 300PCS)


Unit 2

◎ Automatic code scanning → automatic spacing → robot into the bracket →CCD battery positive and negative electrode detection → Laser cleaning on Side A (optional) → mold turnover 1→ Laser cleaning on Side B (optional) → Spot welding on Side A 1→ Spot welding on Side A 2→ Mold turnover 2→ Spot welding on Side B 2→ Spot welding on Side B 2→ Automatically take out the cover → automatically take out the battery → battery semi-finished product cycle assembly line (spot welding appearance detection → paste accessories

→ Protection plate connection → shaping → comprehensive performance test, etc.)

 

Unit 3

◎ One cycle line for double speed chain mold

◎ 15 sets of spot welding mold carrier (L530*380MM)

◎ 15 sets of upper and lower cover plates of spot welding mold for each battery model

Semi-finished battery output line *1

◎ One reflux line for upper mold carrier


Unit 4

Double speed chain assembly cycle line *1 (L16.5*W1.3*H2 meters)

Bt-2410a, 24 series total/series voltage internal resistance tester *1 set (optional)

◎ Double position laser spot welding *1 set (protection plate and B+B- inspection line)

◎ BT-85V05C50F Battery pack performance comprehensive tester


Unit 5

◎ MES electronic Kanban system (one for main server, one for main display screen, one for SOP sub-kanban, one for each station)

◎ Electrostatic eliminator *2

◎ Assemble the static ring of the cycle line and static alarm, 1 set for each station

 

Production flow chart

One Station 18650 / 21700 / 32650 Cylindrical Battery Production Line 1

 

One Station 18650 / 21700 / 32650 Cylindrical Battery Production Line 2

 

Equipment layout Diagram

One Station 18650 / 21700 / 32650 Cylindrical Battery Production Line 3

 

Note: BT-2113 power/energy storage battery pack automatic production line L16.5*W1.5* 1.76m

Double speed chain cycle assembly line L16.5*W1.3*2M

 

One Station 18650 / 21700 / 32650 Cylindrical Battery Production Line 4

Note: BT-2113 power/energy storage battery pack automatic production line L16.5*W1.5* 1.76m

Turning line L4.6 * W1.8 H0.8 M

Double speed chain cycle assembly line L16.5*W1.3*2M

 

Five, equipment environment requirements

1, power supply: AC380V±10%, 30KW 50HZ±10%

2, gas source: 0.4-0.8mpa, no water mist, no impurities

3, ambient temperature: 10-45℃

4, environmental humidity: no more than 85r.h (no moisture condensation)

5, the environment without strong vibration, no corrosive gas and flammable and explosive gas

 

 

 

 

After-sales service

1. Party A is obliged to train party B's equipment users in installation, debugging, use and maintenance for free, so as to ensure that the demander's operators can operate normally and independently, and the maintenance personnel can handle common problems independently

2. The warranty period of the equipment is two years. Party A shall be responsible for three guarantees in accordance with national laws and regulations. After the warranty expires, lifelong maintenance, and at cost price to provide spare parts and wearing parts. If the problem is handled off-site, the supplier shall give a clear reply by email or written form within 4 hours

Get in touch with us

Enter Your Message

You Might Be Into These